We moved out of Hulme after 20 years as we had outgrown our flat, price restricted us to a pretty run down house backing on to the pizza shop. It had been separately let rooms before we returned it to a family house. The order of the works below is the order we had to do it in to minimise the health hazards.
We have occasional days when you can have a look at the work we’ve done and talk to us about how to do it to your own home – the next ones are on March 22nd 3-6pm and March 24th 11am-4pm as part of the Superhome Open Days. If you want to come please email sarah at beeker.co.uk to book.
Posted: October 22nd, 2009
Categories:
Uncategorized
Tags:
Comments:
No Comments.
We’ve been experimenting with making a “cold cupboard” in the kitchen, like an old fashioned larder. We did this by building the cupboard against the wall before it was internally insulated and then insulating the frame and doors of the cupboard (using Spacetherm). During the winter the cupboard has been at 4-10 C depending on the outside temperature and it’s been a good place for jars of jam etc that were previously taking up fridge space as well as vegetables and it’s ideal for beer! The internal shelves have been made from magnesium boards from Econicboard who were really helpful and stock the board in lots of thicknesses. The advantages are that it is moisture and mould resistant, non hazardous and strong. It has low thermal conductivity so should help keep each level cold, rather that the bottom of the cupboard ending up coldest. It’s also fireproof which isn’t that relevant here but it’s useful as a plasterboard replacement. Although this source is mined rather than waste magnesium oxide, which would have been better, it has a lower embodied energy than plasterboard. It is however very heavy in large sheets.

Posted: March 14th, 2012
Categories:
Uncategorized
Tags:
Comments:
No Comments.
We have upgraded our collection of random rusting radiators and fitted Jaga radiators. Because these have their own thermostats on them, they give us more control over room temperatures. We have also fitted zone valves to each floor so that we can heat different areas at different times (particularly because we mostly work from home). The radiators incorporate fans which pull the heat from the water, so we can run the heating at lower flow temperatures. They also have a boost setting, so if the room is particularly cold you can speed up the fan and also the heating process. The noise is similar to a computer cooling fan and we quickly stopped noticing it most of the time, although for light sleepers a radiator with no fan in the bedroom would have been better.
Posted: January 6th, 2012
Categories:
Uncategorized
Tags:
Comments:
No Comments.
The first phase of work on the kitchen has been completed, including a structural steel cabinet which houses two ovens and holds up the chimney. The stainless steel worktop was bent locally to create a shape that will hold up cupboards (except over the hob) and creates an elegant shape with no nasty corners to catch muck in.
The cupboard doors and drawer fronts are made from recycled timber from a demolished high school lab benches.
We’re currently slightly stuck on choosing the ideal board to make the sides of the cupboards and drawer unit out of – current choices include 100% recycled coloured MDF which is lovely but involved buying a whole pallet from Germany when we only need two boards (despite them having a UK subsidiary) or calcium silicate or magnesium oxide which would be ideal if they were made from industrial waste products but the ones we’ve found seem to be freshly mined for the purpose.
The idea is to create a kitchen that will last, with no intention of changing it for a more fashionable one in a few years time, and avoiding the use of plastic covered chipboard which is very difficult to recycle and not a very good idea to burn either.
Posted: January 6th, 2012
Categories:
Uncategorized
Tags:
Comments:
No Comments.
In the kitchen, there is no cornice (someone had put in a 1970s sauna style tongue and groove pine ceiling that fell off when we looked at it hard) and it’s a reasonably large room, so we used a thicker internal insulation instead of the aerogel.
This is Udi In Reco, 120mm thick, similar to the external insulation but with a special smooth internal render as the vapour control layer. This fixed to the wall with much less trouble than the aerogel, using adjustable long screws with plastic plugs on the end. It did mean some joinery work to extend the window cills and surrounds, but these were made with recycled old timber from other parts of the house so the colours match.
Posted: January 6th, 2012
Categories:
Insulation
Tags:
Comments:
No Comments.
We have now insulated beneath all of the ground floor by removing the cellar ceiling and stuffing the gap between the joists with 200mm of hemp (except over the biomass boiler where we used 200mm of rockwool).

This was a lovely material – cuts with a bread knife, smells like harvest time, and no more freezing cold feet. By cutting it slightly large, it holds itself in place with no fixings. It was supplied by Back to Earth (see links for more info).
Eventually we’ll put the plasterboard back, which will be even better.
Posted: January 6th, 2012
Categories:
Insulation
Tags:
Comments:
No Comments.
We finally did the job of removing the plaster from the end wall of each room (the gable wall is already insulated externally) and replacing it with Fermacell board with a triple layer of aerogel bonded to it (27mm thickness in total). The main problems were the dust created by the plaster removal, which gets around any attempt to sheet off the doorway of the room involved, and actually fixing the boards to uneven Victorian brickwork. We didn’t use a nail gun as the bricks vary wildly in softness and quality of fix, so in the end after much trial and error (for which read swearing, in both English and Polish) the fixing method was : cut the boards outside (wearing dust masks because aerogel dust is really unpleasant), drill a hole through the board only then take a sharpened 6″ nail to make a mechanical hole in the polyester mat, then a cheap soldering iron with a long thin bit used to melt the polyester out of the way, then a tool of a brass tube in a piece of plywood is put through the hole to shield the drill bit while drilling a 4mm hole in the brickwork, remove brass tube and replace with piece of pub drinking straw and screw in fixing. The pub straw was later ditched in favour of a frame screw which already has a plastic plug on it. BUT calculatation suggest, and the thermal camera confirms, that this fixing method creates significant cold bridges which reduces the efficiency of the board. If we were able to find a way of countersinking it we would use the plastic fixings with a nylon pin to produce no cold bridge, but these need to be recessed 3mm into the Fermacell if you want to be able to use the Fermacell surface finish and avoid plastering. If plastering is not a problem these could be used without countersinking and plastered over. We kept the board depth to a minimum and did not remove the cornices in the room, so the board just replaces the original plaster layer.

While this work was going on we also found huge amounts of cold air was getting in around some of the sash windows – as soon as the window surround was removed it was clear that a second world war bomb had blown the windows in and they had been shoved back out without being properly refixed (in 1941 judging by the newspapers packing the spaces). So we were able to seal up these air paths too. Next summer we need to replace the pointing around all the windows while they are repainted.

The good news is that the house feels significantly warmer!
Posted: January 6th, 2012
Categories:
Insulation
Tags:
Comments:
No Comments.
We’ve been working on our firewood delivery – up to now it was being craned over our back wall in cages, dragged across the grass on a pallet trolley and thrown through the cellar windows to be stacked. Quite hard work! Now we have a ramp dug down to the basement door and wood arriving in trolleys (the ones used for stacking supermarket shelves). These have been filled with waste wood from a building site which would otherwise have gone to landfill and we’ve got about two years timber lined up in the cellar and down the side ramp. The boiler is much easier to fill from a trolley right next to it and we’re getting more heat from dry old timber.
I’ve also just added a link to Chorlton Eco Refurb, a local group working on getting more work done to the many houses in this area that need it.
Posted: November 5th, 2010
Categories:
Heating
Tags:
Comments:
No Comments.
The thing you realise when you add up all the costs is that all those little trips to the builders merchants do add up! The costs below including fitting and VAT.
The log fired heating system + accumulator cost £7,234 and the solar install with controller and consolar stratifying tank cost £7,182 – this is higher than usual for solar but we have more tubes than anyone regards as normal and we’re still getting heat today in November. As it’s fairly warm outside this will mean we will have enough hot water for showers and can light the small woodburner for heating (which cost £1,100 fitted) instead of the boiler. For a similar price we could have had a pellet boiler and small solar install but this would have been less resource efficient – pellets have to be made and shipped around in tankers where our solar output is now cost free and we’re currently burning Udi woodfibre insulation offcuts, our old roof battens and some beams our builders took out of another house. When nearby skips don’t fill our cellar we get wood from a local tree surgeon which is about two thirds of the cost of pellets.
We added a maintenance gantry and access hatch costing £1,348 which isn’t a requirement but will be cheaper than hiring a scaffold tower when we need to do maintenance.
The new windows cost £635 per square metre, a total of £2,157 for four opening lights and two fixed.
The refurbished windows cost £170 per square metre, a total of £4,550 for twenty windows and secondary glazing the stained glass panels. About half of this is labour and it’s not terribly complicated – if you can use a router and have time on your hands this could be done for alot less.
For insulation we spent £845 fitting glass wool under the ground floor by taking down the cellar ceiling. We spent £5,159 on Spacetherm for the front and back walls and where ceiling height was a problem on the top floor. We bought £638 of wool insulation and £172 of glasswool for the other areas of the top floor ceilings. The Udi Reco system for the gable wall cost £9,373 in total, which is £134 per square metre.
So that’s a total of about £38,500 on the heating, insulation and draft proofing.
Having paid £297,000 for the house in 2004 we’ve spent just over £85,000 overall on maintenance and decoration, which is still less than we would have paid for a house this size in good order. This has given us a brand new roof, draftproof windows, a seriously efficient heating and solar system, complete rewiring including burglar/smoke alarm system, two refurbished bathrooms, two fully rebuilt bedrooms plus an office and a house which is now comfortable in winter – the first sign of spring used to be a visitor with their coat off! Someone less interested in high quality design might not have needed top of the range window fittings, stainless steel sockets and light switches, Italian lights and feature window. And the kitchen is still to be done…
November 2009
Posted: November 3rd, 2009
Categories:
Uncategorized
Tags:
Comments:
No Comments.
18w dimmable fluorescent downlighters (6), 20W HID spotlights (4) and recessed downlights (4), 4 tungsten halogen task lights (4) and compact fluorescents everywhere else.
The house had to be re-wired on acquisition in 2005, so the opportunity was taken to light the house with the most efficient lighting available at the time, but not just utilitarian to show that low energy could mean good design too. LED’s were not available at the time, so spotlighting had to be done with High Intensity Discharge (HID) lamps. Downlighting is done mainly with dimmable, recessed compact fluorescent (PL) downlighters. There are 4 dimmable, separately controlled tungsten halogen tasklights – quite inefficient in comparison now, but only on when needed, and rarely on full brightness. The PL downlighters are a great success providing a warm, attractive, diffuse light. Their dimmability means they can be used according to mood or required function at the time. The HID’s are not so good, they take a while to warm up and once turned off cannot be relit until they have cooled down. Despite assurances from the iGuzzini salesman that these models were not too bad, the warm up time means you cannot turn on the light and walk straight into a room and the relighting period is still about 10 minutes so these lights tend to get left on too much – slightly undermining their energy saving potential. That said they are more efficient that fluorescent and spotlighting can provide much more attractive lighting. The first strip LED’s are about to be installed.
Posted: October 22nd, 2009
Categories:
Lighting
Tags:
Comments:
No Comments.
New windows triple glazed in locally made FSC hardwood frames with double seals. All existing windows refurbished with coated double glazed units or secondary glazing to original stained glass.
The windows were almost all original single glazed timber windows except the attic windows which were later replacements already beyond repair. They are sliding sash on the back, opening casement on the front.
We’ve upgraded the existing windows instead of replacing them using a local carpenter, Reddiseals sash window parts and FSC certified hardwood (Guariuba) to build replacements where the existing had decayed too far. All the windows were fitted with double glazed units low E coated but not argon filled, initial windows had a tiny 6mm cavity as we perfected the way of doing it, this then increased to 9mm or 12mm where space allowed. Original stained glass has been secondary glazed on the inside to avoid condensation, mostly with single glazing but double where space has allowed. All the windows are now fully draft sealed – the sash windows have new parting and staff beads pre-fitted with draft seals. Neoprene O-profiles were routed into the casements, new and existing.
Some of the stained glass needed repairing, which was done by David Sidgwick in Stockport who did a great job.
Posted: October 22nd, 2009
Categories:
Windows
Tags:
Comments:
No Comments.
Waxed FSC hardwood and Venetian plaster wetroom accommodating reclaimed bath.
The floor in the existing bathroom was mostly rotten so had to be stripped down, floor boards binned and half the joists replaced. The opportunity was taken to set the new floor to fall towards the centre of the room into a new floor drain. The outside wall was internally insulated with 40mm of high density glass fibre then overclad with cementitious particle board (Viroc) as it is moisture resistant and stable (although it turns out not quite stable enough to avoid hairline cracks in the plaster). This was then coated in a sheet of thin polyester webbing soaked in liquid neoprene in all the areas likely to get a soaking. Due to the amount of movement in the floor the usual tile solution was not advisable so the floor and most of the 2 long walls were covered in 18mm tongue and groove FSC certified Cumaru from the Ecological Timber Company.

The internal face of the outside wall was covered in Venetian plaster from The Polished Plaster Company, the raw materials from Keighley, applied by our plasterer. The floor and polished plaster are waxed regularly and so far there have been no problems. The bath and taps are the originals. The bath was reglazed, taps just serviced and cleaned. The new taps are low flow spray taps.
Posted: October 22nd, 2009
Categories:
Bathroom
Tags:
Comments:
No Comments.
40kW gasifying log burner and 10 sq.m of solar thermal collectors both feeding into heat stores providing space heating and hot water.
The boiler the house came with was so arthritic no engineer would touch it. Manchester is a smoke control zone. The only kit with the DEFRA exemption was either too big or eye wateringly expensive or both, and its fuel – pellets was mostly shipped in from abroad, slightly denting the low carbon credentials. Sundance Renewables – a co-op in south Wales introduced us to the Atmos gasifying log burner. It burns logs, sucking the flames into a chamber beneath the logs which ensures a very hot clean burn with minimal ash. We got hold of the test data and it is well below the threshold for exemption so after 18 months we talked the smoke control officer into letting us install one – although with the caveat that he has the right to insist on its removal if he gets complaints. It does emit smoke, but only really an issue for the first half an hour then it calms down and the whole process of a burn is finished within 2 hours anyway, all the heat is dumped into 2 water tanks – thermal accumulators.
They both have solar and hot water heat exchange coils in them. Cold water is pre-warmed in the lower larger tank first, then taken up to full temperature in the upper one. In summer the solar panels feed into the top tank first then when up to top temperature feed into the bottom. In winter they feed into the cooler lower tank. The top tank made by Consolar also has syphons in it that help make sure the store stratifies so that even when the heating draws hot water from the middle of the tank the top where the hot water is drawn through remains hot.
We had alot of help with designing and fitting the system from Richard Drover and also from Greenshop Solar, who sold us the control system. 
Solar Panels
We have put as many panels up as we could fit neatly to minimise the amount of wood we’ll have to burn. There are 80 tubes in 4 arrays running the full length of the ridge with a thin access walkway running beneath them that both masks them from the street below a little and allows safe access. These are the cheapest well reviewed ones we could find from Navitron on the basis that with so much water into which to put the heat we do not need expensive methods of dealing with overheating. We have an added overheat protection of an old radiator from the top of the house plumbed behind the stored wood in the cellar so that spare heat can be used to dry wood further – needless to say in a Mancunian summer there was only 1 day when it looked like it might divert from the 2 tanks to this.
Posted: October 22nd, 2009
Categories:
Heating
Tags:
Comments:
No Comments.
Gable wall – external ly insulated – Udireco rendered 170mm recycled woodfibre. Front and back walls – internally insulated (bought but not yet fitted) 27mm Spacetherm glued to Fermacel board. Outrigger – tbc.
This took ages to work out, trying to marry up recyclability with embodied energy and while avoiding pervasive toxins, environmental degradation and derivatives of fossil fuels. Originally we were going to use Foamglas externally on the gable and internally on the front and back but the price was very high for what it is, and while the product is recycled, it is from a very high grade feedstock. Also this would have meant the whole house became entirely vapour sealed which splits commentators as to how bad this is.
External
Once deciding on breathability as key there are very few choices – mineral wool or wood fibre with either lime or diffusion open polymer render. They are pretty closely matched on embodied energy and toxicity. The tip to the balance was from sequestered carbon, the benign properties of wood fibre over glass, and UDI’s sustainability efforts through the entire product – glues, etc combined with the service from them and their UK agents Back to Earth. This produced a U-value of 0.2W/m/K
Internal
Breathable internal insulation is not advised here in the UK, internal insulation can cause issue anyway as the internal surface of the brickwork under the insulation will most likely be below dewpoint for much of the year so any water vapour there will turn into water so the strategies deployed are usually to prevent it getting there in the first place or ventilating the space between the lining and the masonry.
Add to this the fact that we want to keep the original plasterwork details – nothing spectacular, but part of the character of the place and our choices are very limited. The plaster is quite deep so we’ve got about 40mm to play with. The desire to avoid fossil fuels and foams becomes a prohibition internally as most of these materials would add considerably to the toxic load in a fire. Spacetherm uses aerogel impregnated into a mat, glued to a board it has the highest insulating properties after vacuum insulating panels – 0.13 W/m2/K and while high in embodied energy very little is used it is non toxic and enabels the walls to reach a U-value of 0.38 without thickening the wall. Its key disadvantage is cost, but it can be fixed directly to the wall with no framing or glueing so the cost of the material should be offset by the ease of installation. The boards have a built in vapour barrier and the mat itself is hygrophobic so with so little space in which vapour can gather the problem of interstitial condensation should be minimised.
The price of the Spacetherm is so high that where there are no plaster details left and window reveals can be adapted there is still room for another solution. As this is a pilot the intention is to try out a breathing internal wall insulation. There are 2 wood fibre solutions out there.
Posted: October 22nd, 2009
Categories:
Insulation
Tags:
Comments:
No Comments.
Recycled slates on TLX Gold vapour permeable multifoil sarking overall, over either formaldehyde free glasswool to 350mm, high density glass-fibre batts on Spacetherm or Thermafleece sheep’s wool between built up rafters, underdrawn with plasterboard
There are 3 configurations to the the roof insulation once past the covering:
The remaining floorspace above the attic rooms, in which we have simply topped up the glasswool, down the middle we have used some unwanted rigid insulation to create a crawlway now the insulation is so deep, to get to the solar plumbing. U-value 0.1 W/m2/K
The main slope of the roof has had the rafters built up to accommodate 200mm Thermafleece and is then underdrawn with 10mm plasterboard and skim with no vapour barrier, so fully vapour permeable. U-value 0.143 W/m2/K

The area under the half gable and dormers where space is at a premium has 100mm Hi-Cav 32 rigid glass wool batts, at the time of installation formaldehyde free was not available but to get the highest insulation value for the smallest thickness this is undrawn with 27mm of Spacetherm on Fermacel board which is vapour impermeable. U-value 0.148 W/m2/K
Posted: October 22nd, 2009
Categories:
Insulation
Tags:
Comments:
No Comments.